Integrity Management of Pipline by DNV

A joint industry project led by DNV Energy is formulating guidelines for submarine pipeline system integrity monitoring. The resultant document of recommended practice, DNV RP-F116, will provide the oil and gas industry with a useful tool in an area where no such formal guidance currently exists, according to project manager Bente Helen Leinum.
The need to keep pipelines operating safely and efficiently is paramount in times of high oil prices, when financial losses resulting from downtime can mount rapidly. However, taking action can be a challenge. Many pipelines are aging but may be required to remain in operation, often beyond their design lifetime. Increased use of optimized design also implies the need for close monitoring.
Additionally, there is increasing pressure at the regulatory level. Authorities around the world are adopting a more proactive approach as they seek to minimize the risk of environmental harm resulting from pipeline leaks. This leads to stricter regulation and standards of integrity monitoring, and operators must be able to document compliance.
For companies operating internationally, the situation is not made easier by the fact that the regulatory situation can differ widely. In many countries there are few or no requirements, while in others the regulations can vary from prescriptive to functionally based, or combinations of the two.

Pipeline integrity management processes, taken from the updated code of pipeline design issued by DNV last year.
Click here to enlarge image
However, while the need for integrity management is becoming stronger, there are often implementation difficulties. Many pipelines, especially older ones, were not designed to facilitate today’s proper monitoring and inspection. Moreover, many pipelines are unpiggable, making them impossible to inspect with an intelligent pig.
In practice, operators have had to come up with their own solutions for pipeline integrity monitoring. Many companies use API and/or ASME codes developed for onshore pipelines, combined with their own, often project-specific, pipeline integrity management systems.
DNV RP-F116 will therefore provide a reliable point of reference for both industry and authorities, helping to raise the standard of subsea pipeline integrity management. Companies also will be able to use their adherence to it when documenting their compliance with regulations. For authorities the document will hopefully provide a useful tool when they review their regulatory regimes.
The project grew out of the updated code for pipeline design, DNV OS-F101, which DNV issued last year, Leinum says. As part of this work, a small joint industry project (JIP) examined issues of pipeline integrity management and formulated minimum requirements for the safe and reliable operation of subsea pipelines. In the process, the participants became aware of the need for more detailed guidance.
When the current JIP was proposed, the number of interested participants soon made it a viable proposition. The sponsors include oil companies CNOOC, DONG Energy, Eni, Gaz de France, StatoilHydro, Norwegian pipeline operator Gassco, Norwegian research institute Sintef, to which some of the project tasks have been assigned, and DNV itself. The budget is NOK 2.8 million ($545,000).
In parallel, DNV’s Houston office is managing another JIP covering submarine pipeline integrity management in the Gulf of Mexico. The results from this work, for which the project manager is Dan Powell, also will be used as input to the development of DNV-RP-F116.
At present there are no regulatory requirements in the GoM. But in parallel with this industry initiative, the Minerals Management System (MMS) has declared its intention of introducing requirements, publishing draft proposals last fall.
The GoM JIP was prompted by one of DNV’s earlier studies for MMS in which it assessed the integrity practices of GoM operators. Among the findings was that only 5% of pipelines can accommodate inspection pigs, obliging operators to rely on informal risk-based approaches to integrity management, coupled with monitoring and preventive measures.
Oil companies should be involved in such projects, Leinum says – they are an important source of current practice, which will be reflected in the recommended practice (RP). DNV also has a wealth of experience to contribute from its own activities, much of it distilled in the many RP documents it has published with respect to pipelines.
Three main areas of integrity management have been identified:
  • The establishment of integrity in the design-manufacturing-installation phase – there is growing awareness of this need within the industry, and it is becoming more common for oil companies to involve integrity personnel at the design phase
  • The transfer of vital information from design to operation to ensure integrity of the pipeline during operation
  • The maintenance of integrity in the operational phase – which is the main scope of the recommended practice.
Following the launch of the DNV RP-F116 project, a workshop staged in December 2007 resulted in an agreed framework for the RP. The first draft is due to be discussed at a workshop this month. Another workshop will follow in September, and a fourth this December to put its seal on the final draft.
This will be taken over as a formal DNV document, translated into the DNV template and sent out for external consultation. Depending on the number and complexity of comments which need to be accommodated, the final document should be published by May 2009.

Sumber : 
http://www.offshore-mag.com/articles/print/volume-68/issue-4/norway/dnv-promoting-improved-integrity-management-of-pipelines.html

Spiral Pipe for Offshore Project

Spiral welded line pipe has been used extensively for onshore applications,however there has been some reluctance to specify spiral welded line pipe foroffshore applications. A joint industry project is beeing carried out togetherwith coil manufacturers, pipe manufacturers, installation contractors andoperators to review the status regarding offshore applications for spiralwelded pipes and identify the most critical technology gaps using a technologyqualification process. Detailed suggestions as to how the gaps can be met havebeen made. An update on efforts to close these gaps is ongoing.
The challenges for spiral welded line pipe include design, metallurgical andquality control issues. The design issues include fracture arrest, collapse anddisplacement controlled loading conditions which are all highlighted in DNVsstandard for submarine pipelines (DNV OS F101). The design issues regardingload controlled displacement are mainly due to limited experience with spiralwelded line pipe subjected to large strains. For running fracture the limitedexperience with spiral welded pipe for offshore applications is an issue.

There are 5 new spiral welded pipe mills in United States so availability hasimproved. The review includes an assessment of typical pipe material testresults and whether properties required for offshore applications canreasonably be expected.

t appears that the industry has a general understanding that the performanceof spiral welded (SAWH) pipes is different to Submerge Arc Welded (SAWL)/ HighFrequency Welded(HFI)/ Electric Resistance Welded ERW linepipe when exposed tothe same loading conditions, and that currently existing design standards foroffshore applications may not be applicable. An important issue is to establishhow the spiral wound linepipe can be produced consistently to a high level ofquality, and what is required by the design standard for spiral welded pipe tobe fit for purpose for offshore use. Some of the main areas of concernregarding the quality of spiral wound linepipe will be discussed. The aim is toassess whether SAWH linepipe can be considered equivalent to SAWL and HFI/ERWlinepipe.
The use of spiral welded linepipe (SAWH) for pipelines has generally been themost popular manufacturing choice of linepipe for onshore low pressurepipelines, pipelines transporting water, ship borne piping, or very shallowwater, low pressure pipelines (≤ 500 ft).

Recently there has been more interest in the use of spiral wound linepipe, dueto the following reasons:
•  There are five new SAWH pipe mills in America with “state-of-the-art”technology.
•  SAWH linepipe is a cost-effective solution compared to the othermanufacturing processes.
•  Generally, the chemical compositions, mechanical properties anddimensional tolerances are assumed to be comparable to SAWL pipe.
•  SAWH linepipe can be manufactured in 80 ft lengths with diameters from20 to more than 100-inch OD and wall thicknesses ranging from approximately 9to 25 mm.
•  Some SAWH pipe mills have coating capabilities for 80 ft pipe lengths(FBE and 3-layer coating systems). 80 ft pipe lengths could mean lessfabrication costs for the installation contractors.

Sumber : 
http://www.petrotraining.org/spiral-wound-line-pipe-for-offshore-applications-8118-32

PLEM/PLET

As the oil & gas field development moves further away from existing infrastructures, it often requires a subsea tie-in of the export system with the existing pipeline system. 

Margon Resources specializes in the custom fabrication of pipeline end manifolds (PLEM) and pipeline end termination (PLET) subsea systems and their associated custom fabricated sled.

A PLEM is a subsea structure used to connect rigid pipeline with other subsea structure such as a manifold or a tree, through a jumper. The PLEM has facilities for pig launching and/or receiving. The header is equipped with a ball valve, to isolate the line, allowing recovery of the Pig Launcher / Receiver (PLR). 

A pipeline end termination (PLET), for joining one pipeline valve and one vertical connector.
Both PLEM’s and PLET’s are usually mounted on a flat platform called a sled that is configured specifically for the PLEM/PLET to which it is attached.

Sumber :  
http://www.realbase.com.my/index.php?option=com_content&view=article&id=43&Itemid=53

Crack detection in gas pipelines

In gas lines, however, the detection of crack-like defects incurs a high additional cost because the ultrasonic method requires a coupling liquid, and ultrasonic pigs can only be run with a liquid batch. A crack detection pig for gas pipelines was therefore urgently required. 

High pressure long distance pipelines transporting gas, crude oil or products are inspected by intelligent pigs for the location of defects. These inspections are an important contribution to the continued safe operation of these pipelines.
Typical defects are geometrical anomalies, metal loss and crack-like defects. Intelligent pigs are measuring robots which are propelled through the pipeline to detect defects, using appropriate measuring techniques.

For geometrical anomalies, pigs with mechanical sensors have been used for many years. It is customary to inspect new pipelines with calliper pigs prior to commissioning.
In the 1970s metal loss (corrosion) was the type of anomaly that caused the development of the first intelligent pigs. For metal loss two technologies are customarily used: the ultrasonic method, which measures the wall thickness directly, or the magnetic flux leakage (MFL) method, which responds to the change of the magnetic field in the presence of metal loss.
The ultrasonic method is the more accurate method, but a coupling liquid is required to apply the ultrasonic pulse to the pipe wall. It is therefore mainly used in liquid pipelines. The MFL method, on the other hand, does not require a coupling liquid and is therefore the preferred method for gas pipelines. Both types of instrument have been operated for many years and play a central role in the upkeep and maintenance of high pressure long distance pipelines.
During the 1990s longitudinal crack like defects began to appear additionally in more and more pipelines causing serious problems. This led to the development of a new generation of crack detection pigs.
Types of Cracks
Even though isolated fatigue cracks have been seen since the 1970s, it was the increased appearance of stress corrosion cracking (SCC) defects in the 1990s that led to some spectacular pipeline failures in Russia and North America. Figure 1 shows typical SCC colony.
SCC develops in pipelines under narrowly defined conditions. These include: susceptibility of the steel, moisture of the soil, soil chemistry, quality of the coating, variable stress and highly increased temperatures. SCC first appeared in the above mentioned areas mainly in high pressure pipelines directly downstream of compressor stations and now also occurs more and more often in liquid pipelines, even though these lines do not display increased temperatures.
Apart from SCC, metal fatigue cracks are becoming increasingly common, mainly due to the increasing accumulated number of pressure cycles in the aging pipeline population.
Cracks, which influence the structural integrity of the pipeline, are mainly longitudinally orientated, caused by the predominant stress distribution in the steel. Fatigue cracks can grow both from the internal or the external surface of the wall. Because of the growth mechanism, SCC cracks are external defects.

Batching with UltraScan CD
In the early 1990s the UltraScan CD crack detection pig was developed by GE Energy. It uses angular beam ultrasonic technology to detect longitudinal cracks. The sensors operate in the immersion mode, the transported fluid is used as coupling liquid.
The basic principle is demonstrated in Figure 2. The angular ultrasonic beam is reflected to and fro between the two surfaces at an angle of 45°. If the signal is reflected by a crack it travels back along the same path and is received by the same sensor as the echo signal. The appearance of the echo signal along the time coordinate indicates whether the crack is located internally or externally. As the tool is designed to detect longitudinal cracks the sensors are slanted with circumferential orientation to allow the beam to travel through the wall perpendicular to the longitudinal direction. In order to scan each defect from both sides two sets of sensors are employed, one operating clockwise, the other in an anti-clockwise direction. Each ultrasonic pulse is monitored up to two and a half full reflections (skips), meaning each crack is seen by several sensors from different distances. This results in a redundancy of information which is important to guarantee a reliable detection of the cracks and to differentiate between real cracks and harmless small inclusions in the material.
The multitude of sensors are mounted on the sensor carrier so that the entire pipe circumference is scanned in one pass (Fig. 3). The effective distance between sensors in circumferential direction is about 10 mm. The individual skids of the sensor carrier are mounted in such a way that geometric irregularities of the pipe are compensated and the sensors are always locally orientated with the right angle to the wall.
During the inspection, large amounts of data are generated. During the travel of a 24 inch UltraScan® CD tool through a 100 km long pipeline, 100 terra bytes of primary data are generated. The data is screened in real time for signals relating to crack like defects and only those signals are stored in the on board solid state memory. To achieve this, the most advanced FPGA electronic components are employed in the tool.
The UltraScan® CD detects all defects of 25 mm minimum length and 1 mm minimum depth. The data is displayed as a coloured area scan (C-Scan). The colour displays the intensity of the reflected signal according to the colour code. The intensity of the signal is an indication of the depth of the defect (Figure 4). UltraScan CD tools have inspected more than 15 000 km of pipeline since their introduction in 1994 and detected a total of 3000 SCC colonies and over 700 fatigue cracks.
The ultrasonic technology is established as the industry’s most reliable and accurate method to detect cracks. In liquid pipelines the UltraScan® CD can be applied directly in the transported medium. This is not the case in gas pipelines, because the coupling liquid is not readily available. To inspect a gas pipeline reliably for cracks the UltraScan® CD tool has been run in a liquid batch in recent years. 

Sumber : 
http://pipeliner.com.au/news/crack_detection_in_gas_pipelines/043294/



Pipeline Protection Using Coating

Coating mills apply pipe coatings to protect the line pipe from corrosion.  Often, the coating mill is located adjacent to the pipe mill, so line pipe moves directly from the pipe manufacturer to the coating facility.

The natural gas industry uses several different types of pipe coatings.  Historically, pipeline companies coated pipe with coal tar enamel or an enamel tape wrap.  Today a fusion bond epoxy (FBE) coating is used most widely.  FBE coating can be recognized by its light blue color, often seen on pipe being transported by rail or truck. Regardless of the type of coating used, the purpose is the same: Prevent external corrosion by prohibiting moisture from coming into direct contact with the metal.

To prepare for fusion bond epoxy coating, the external surface of the pipe is thoroughly cleaned with a shot-blast process.  The pipe is then heated to a prescribed temperature and an epoxy powder is applied. The powder "melts" onto the heated pipe and forms a water tight barrier.  Prior to transporting the pipe to the job site, the mill tests the coated pipe with high voltage electricity to evaluate the coating's insulating effectiveness. 

Sumber : http://www.ingaa.org/Topics/Pipelines101/109/4063/112/127.aspx

Line Pipe

Line pipe is manufactured from high-strength carbon steel, and is made to strict engineering and metallurgical specifications developed by the American Petroleum Institute (API).
One particular standard, API Specification 5L, defines requirements for pipe made to transport natural gas, oil and water.  This specification includes standards for the dimensional, physical, mechanical, and chemical properties of the carbon steel.  Several pipe mills in North America and around the world manufacture API 5L line pipe for the natural gas industry.  Pipe mills produce two types of line pipe: seamless and welded.

Seamless pipe is formed from a cylindrical bar of steel that is heated to a very high temperature and then is pierced with a probe to create the hole through the cylinder.  Rollers size the cylinder to produce the proper diameter and wall thickness. This technique is used to make small diameter pipe, from 0.5 inches to 24 inches in diameter.

Most pipe produced for interstate natural gas pipelines is the welded variety, because interstate systems require larger diameter pipe.  Pipe mills manufacture line pipe by forming a steel plate or coil into a cylindrical shape, and closing the seam using a welding process.  The mill evaluates the quality of the weld seam using ultrasonic and/or radiological inspection methods and pressure tests each joint of pipe to levels significantly higher than the eventual operating pressure of the pipeline.  
The pipe is further tested to ensure that it meets all requirements of steel chemistry, strength and toughness, and dimensional characteristics.  Mills that produce line pipe to API specifications meet the most stringent criteria for steel making and pipe production technologies to ensure safe, reliable pipeline service.  The gas pipeline industry maintains the manufacturing and test records of the pipe for the life of the pipeline.

Pipeline Size and Design
The size of interstate pipelines varies, but in most cases a mainline, the principal pipeline that delivers natural gas, ranges from 16 to 48 inches in diameter.  Other smaller pipelines called laterals deliver gas to the mainline or take gas from the mainline and range from six to 16 inches in diameter.
The volume of gas to be delivered and the pressure at which the pipeline will be operated determines the pipeline’s ultimate diameter.  In order to meet customer delivery requirements most interstate gas pipelines operate at a pressure of at least 600 pounds per square inch (psi), but typically at about 1,000 psi.

The thickness of the pipeline is determined by the maximum operating pressure (MAOP), and is based on published industry standards and federal regulations. The pipeline incorporates a design safety factor, prescribed by U.S. Department of Transportation (DOT) regulations, that is related to the type of construction and population density along the pipeline route.

Sumber : http://www.ingaa.org/cms/112.aspx

Welding New Technology in offshore Pipline

The installation of gas pipe through the designated wetland areas of Mississippi and Alabama could prove challenging for any contractor, but the thick-walled pipe specified on the Gulfstream Project presented new welding challenges for contractor Sunland Construction Inc. Because the pipe is two times as thick as that typically used, Sunland relies on innovative welding techniques to decrease the number of weld passes necessary and most importantly, to assure the welds produced are consistent, x-ray quality.
 
Sunland Construction Inc., headquartered in Eunice, Louisiana, turned to The Lincoln Electric Company's Autoweld® automatic orbital pipe welding system for the fill and cap passes and the STT® (Surface Tension Transfer®) process to lay the critical root pass. By implementing these new welding technologies, Sunland has been able to remove one electrode pass from the root pass process as well as eliminate all grinding from this step. With the Autoweld system, the company has reduced the time to put in the fill and cap passes.
"We have realized dramatic improvements since using the new Lincoln welding systems in both higher quality and time savings," said Joe Ratcliff, Project Manager for Sunland Construction Inc. "Our welders are proud of the new equipment, it has made the welding portion of this job run smoothly."

Gulfstream Project
The Gulfstream Project is a natural gas pipeline that originates near Pascagoula, Mississippi and crosses the Gulf of Mexico to Manatee County, Florida. Once onshore, the pipeline stretches across south and central Florida to Palm Beach County. This natural gas pipeline will serve Florida utilities and power generation facilities, generating 1.1 billion cubic feet per day of additional natural gas - enough to supply electricity for 4.5 million homes.
Sunland Construction Inc.'s portion of the pipeline includes installation of 6.1 miles of 36" diameter pipe in Jackson County, Mississippi and 9 miles in Mobile County, Alabama.
A 27-year-old company with five divisions, Sunland won the Gulfstream job through a competitive bid process. More than 250 employees are being utilized on this project - taking a total of seven months to complete. Sunland expects its portion of the Gulfstream project to be wrapped up in early 2002.
According to Ratcliff, preparing for pipe installation on this job is no small feat. "Before we can even begin to weld, we must first clear the land, prepare a right of way, install piling in some areas, erect construction bridges and bring in additional soil where need. Because of the conditions of the wetland areas, all welding crews have to work on large, 4 ft. x 20-ft. timber mats. These mats, sometimes put down in a number of layers, provide a stable, dry work surface. Once work is complete in an area, Sunland Construction Inc. is also responsible for restoring the surrounding area to its original condition.
"Welding for this job is completed with three crews, one welding right after the other," noted Ratcliff. "The first crew installs the root pass, the second crew immediately follows using stick welding to accomplish a hot filler pass, and then the Autoweld crew completes the welding process with fill and cap passes."
Because of the extreme conditions on the site, the Autoweld process is performed inside of a welding "house" or modular unit that is lifted and moved every 40 ft. (from joint to joint) by a Caterpillar Challenger with a side boom.
extreme conditions at the gulfstream project site
The Pipe
Pipe for the on-land portion of the Gulfstream Project is provided by Berg Steel Pipe Corporation of Panama City, Florida and its parent company, Europipe GmbH of Germany. The X70 pipe ranges in wall thickness from 0.635 to 1.22. This thick-walled pipe was specified so the pipeline could handle the pressure range of the Gulfstream system. Pipe is coated with a Fusion Bond Epoxy (FBE) on both the interior and exterior, and a majority of the pipe is also concrete coated for buoyancy control.

Root Pass
Sunland Construction Inc. utilized the STT process because of the advantages it offered.
STT is a modified MIG process that uses high frequency inverter technology with advanced Waveform Control to produce high quality welds while also significantly reducing spatter and smoke. STT technology has the ability to control weld puddle heat independently of wire feed speed - this allows the welder more control over the puddle and provides the ability to adjust the heat input to achieve the desired root bead profile. The welder simply positions the arc on the forward portion of the weld puddle and follows it around the pipe in a vertical down fashion.
STT is a modified MIG process that uses high frequency inverter technologyWith the system, Sunland welders can achieve a uniform gap by using an internal, pneumatic clamp to line up and space the pipe for accurate welding.
For the Gulfstream Project in particular, STT is able to produce a quality weld and allows an increased amount of weld metal to be placed on the heavy wall pipe for improved resistance to cracking. With STT, Sunland only has to make one pass for the root bead as compared to two passes plus grinding time with stick.
"Since the root pass is the foundation for the rest of the weld, achieving a high quality, strong and uniform weld is very important to us," said Ratcliff. "We are very pleased with the STT. It has allowed us to save time and is an easy system for our welders to learn. The STT process is very forgiving, meaning that it helps compensate for misalignments, if and when necessary."
two STT machines on the Gulfstream job site are used in conjunction with Lincoln's .045 L-56™ SuperArc® wire and 100 percent CO2The two STT machines on the Gulfstream job site are used in conjunction with Lincoln's .045 L-56™ SuperArc® wire and 100 percent CO2 shielding gas. As compared to blended gases, CO2 is able to provide better penetration and is less expensive.
"The STT is able to apply a root bead with great consistency over a wide variety of joint conditions" explained Ratcliff.

Hot Filler Pass
Once the root pass is complete, the next team of welders follows closely behind to weld in the hot filler pass. Due to the thickness of the pipe on this job, Sunland Construction Inc. elected to put a single downhill hot filler pass over the root with a downhill, low hydrogen stick process. "The added filler metal we deposited at this stage gives us additional backing to lay the first wire filler and means that we don't have to make quite as many passes with the Autoweld system," noted Ratcliff.
To do this interim step, Sunland is using Lincoln's LH-D 80 rod with a conventional 300-amp Lincoln belt-driven welder.
Fill and Cap
For the Gulfstream Project, Sunland Construction Inc. decided to invest in an automated process to weld the fill and cap passes. Previously, Sunland has been completing the fill and cap passes with a 70+ stick electrode, welded vertical down and requiring numerous passes.
"We wanted an automatic method to increase efficiencies and decrease overall costs," said Ratcliff. "It was also important for us to find a system that could provide a quality product but yet was easy to operate.
In its quest, the company contacted a number of manufacturers to research which system would work best in this application. "We narrowed down our choices and visited a couple of manufacturers to try out their systems, one of those being Lincoln Electric," noted Ratcliff. "Our team traveled to Lincoln's Cleveland headquarters where we had the opportunity to run our procedures on an actual Autoweld set-up. After we returned, we listed the pros and cons of every system and Lincoln's Autoweld came out on top. A big factor in our decision was the amount of technical support that Lincoln could provide to us."

autoweld systems were enclosed to allow work during all weather conditionsThe Autoweld system is enclosed in a house, so that welding can be done out of the elements. These houses are moved by sidebooms ( Challengers ) from one length of pipe to the next. Sunland uses six Caterpillar Challengers with PTO driven generators to produce the 100 amps at 460 volts needed to operate the Autoweld and accessories.
Lincoln's Autoweld system uses a specially designed lightweight-welding head to travel around the circumference of the pipe. In addition, the unit utilizes an external crawler band placed on the pipe to one side of the field joint weld bevel. Two machines operating simultaneously complete the vertical up welding - one machine starts at the bottom with the other starts on the side. Once the machine that started on the side reaches the top, it then is positioned to start at the bottom to complete its side of the pipe. Using the vertical up process is a break from the traditional, vertical down welding typically utilized for pipe.
Each wall thickness of pipe requires different machine settings for each specific pass. These settings are charted and can easily be set from the machine. The Autoweld system uses a flux core .052" wire and a shielding gas of 25 CO2/75 argon.
With Autoweld, Sunland Construction Inc. is achieving repetitiously consistent, x-ray quality welds. "Autoweld makes a very consistent, uniform, and precision-controlled metal deposit," noted Ratcliff. "The weld has high tensile strength and good Charpy values in the weld and pipe heat zones. The machine is also very durable and dependable."
Sunland's Autoweld system is powered by an Invertec® V350-PRO, an extremely lightweight inverter that is able to handle multi-process applications. The hallmark of this power source is an extremely smooth arc due to the unit's advanced inverter technology.
"We feel the V-350 is the state of art in welding equipment, it gives you the ability to maintain precise settings and arc performance," claimed Ratcliff. "Even after long hours of use on our construction site, the machine was dependable."

Quality Control
All welds once completed are visually inspected and then x-rayed with an internal crawler. All welds must meet API 1104 Section 9 requirements.
Service
STT and autoweld systemsSunland Construction Inc. has been extremely pleased with the service it receives from Lincoln. "The on site support provided by the Lincoln Electric Mobile team of Troy Gurkin and Steven Brown has been superb," said Ratcliff. "We also enjoyed tremendous support from the Cleveland based Autoweld group including Eric Stewart, Autoweld technician, who was on site for much of the project. Lincoln has gone out of its way to help us implement our new processes and suggest new technologies when appropriate."
Sunland has also taken advantage of Lincoln's training programs on-site and in Cleveland. "Lincoln was challenged with taking welders at all different levels of expertise and work with them to learn to understand and operate the Autoweld system. It was a massive training effort that required quite a bit of Lincoln's time. We appreciate all they have done to make this job run smoothly."

Sumber :
http://www.lincolnelectric.com/en-us/support/application-stories/Pages/sunland-surface-tension-transfer-welding.aspx